| Electrode Specifications
III. GROUND SYSTEM TESTING
- Prior to connection to any utility
the grounding system shall be tested by a qualified firm
to determine the resistance-to-ground of the system.
- The following tests are acceptable
methods for the resistance-to-ground verification:
- Clamp-on Induced Frequency Resistance-to-Ground method.
- 3-point Fall-of-Potential method.
|