 |
|
|
|
  |
  |
 |
 |
| II. GROUND SYSTEM TESTING |
 |
- Prior to connection to any
utility the grounding system shall be
tested by a qualified firm to determine
the resistance-to-ground of the system.
- The following tests are acceptable
methods for the resistance-to-ground
verification:
|
- Clamp-on Induced Frequency Resistance-to-Ground
method.
- 3-point Fall-of-Potential method.
|
|
 |
|
|
|
|
|
 |