GPRs
Diagrams
II. GROUND SYSTEM TESTING
  1. Prior to connection to any utility the grounding system shall be tested by a qualified firm to determine the resistance-to-ground of the system.
  2. The following tests are acceptable methods for the resistance-to-ground verification:
  1. Clamp-on Induced Frequency Resistance-to-Ground method.
  2. 3-point Fall-of-Potential method.
Description
General Installation Instructions
Verbiage for Print Specification
About Us | Products | Services | News | FAQs | Customer Login | Contact Us | Site Map